Our product range includes a wide range of eot crane anti collision device.
₹ 3500 / Piece Get Latest Price
| Switch Type | ON/OFF |
| Brand | Arasur |
| Material | Aluminium |
| Operating Temperature | 110V TO 220V AC |
| Output Contact Rating | 5A |
| Power Supply | 220V |
| Usage/Application | Industries |
| Voltage | 220V |
SPECIFICATIONS:
1. Supply : 110 V AC & 220V AC, 50 Hz
2. Output : potential free contact rated at 5 Amp @ 230V AC3. Range : For ACC 03− 3 mtr. Maximum, minimum− 1.5 mtr. For ACC 10- 10 mtr. Maximum, minimum−5 mtr.
4. Indication: LED
5. Laser Alignment Tool for alignment of reflector and control unit.
6. Dimension –a. For control unit – 190 × 145 × 50mm
b. For Reflector ACC 03 and ACC 10 – 130 × 75 mm
Terminal Strip Connections:
1. P - Phase 220V AC CAUTION : Connect 110V / 220V
2. P - Phase 110V AC AC at appropriate terminals.
3. N - Neutral Never connect 220V AC supply
4. E – Earth to 110V AC terminal No. 2
5. NC - OUTPUT - Normally closed contact
6. C - OUTPUT - Common
7. NO - OUTPUT - Normally open contact Connection
INSTALLATION :
1. Mount the control unit on one crane.
2. Press the laser alignment Switch provided on black plate and keep It pressed. A red spot will be seen. Now align the reflector with this Red spot at the required distance on the other crane. Now release the switch. The red spot will turn OFF. You can align the reflector and control unit with this switch. This switch should be used only at the time of alignment.
3. Make sure that both the contr units should not be placed opposite to each other.
4. Connect the coil of the contactor controlling the moving crane as Shown in connection diagram above.
5. In case both the cranes are moving, install another set with reflector on the crane carrying the control unit of 1st crane and control unit on 2th crane. Install 2 units as shown below for proper working.
Hemangini (Proprietor)
Arasur Multi Product Solutions
Ground Floor, Shop No 19, Brij Industries,A2/10, Gidc Makarpura, Nr.Bundy India
Vadodara - 390010, Gujarat, India